Hydroseeding Services
The fast, cost-effective way to establish a beautiful, healthy lawn.
What is Hydroseeding?
Hydroseeding (also called hydro mulching or hydraulic seeding) is a planting process that combines grass seed, mulch, fertilizer, and water into a thick slurry. This mixture is then sprayed evenly across your soil using specialized equipment.
The result? A uniform, fast-germinating lawn that costs significantly less than sod installation while producing superior long-term results.
Benefits of Hydroseeding
Cost Savings: Hydroseeding typically costs 70% less than sod installation, making it the economical choice for large areas.
Fast Germination: Expect to see grass sprouting within 7-14 days under proper conditions. Full establishment occurs in 4-6 weeks.
Superior Coverage: The slurry application ensures complete, even coverage—even on slopes and uneven terrain where traditional seeding fails.
Erosion Control: The mulch component provides immediate erosion protection while the grass establishes its root system.
Custom Seed Mixes: We select grass varieties specifically suited to your soil type, sun exposure, and the Texas/Oklahoma climate.
Our Hydroseeding Process
1. Site Evaluation: We assess your soil, drainage, sun exposure, and any challenging conditions.
2. Preparation: We ensure proper grading and soil preparation for optimal seed-to-soil contact.
3. Custom Mix: We prepare a slurry with the right seed blend, mulch, tackifier, and fertilizer for your specific needs.
4. Application: Using professional hydroseeding equipment, we spray the mixture evenly across your entire area.
5. Care Instructions: We provide detailed watering and maintenance guidance for optimal germination.
Ideal Applications
- Residential Lawns — New home construction, lawn renovation, bare spots
- Commercial Properties — Office parks, retail centers, industrial sites
- Construction Sites — SWPPP compliance, site stabilization, final grading
- Slopes & Hillsides — Areas where traditional seeding would wash away
- Large Acreage — Ranches, farms, sports fields, parks
Ready to Get Started?
Contact us today for a free, no-obligation quote on your hydroseeding project.
Frequently Asked Questions
How long until I see grass growing?
Under proper watering conditions, you should see germination within 7-14 days. The lawn typically reaches mowing height in 4-6 weeks.
Is hydroseeding better than sod?
Both have their place. Hydroseeding is more cost-effective for large areas and produces grass that's adapted to your specific conditions. Sod provides instant results but costs significantly more.
What time of year is best for hydroseeding?
Spring (March–May) and fall (September–November) are ideal in Texas and Oklahoma. We can work year-round, but these seasons offer optimal growing conditions.
How much does hydroseeding cost?
Typically $0.06–$0.20 per square foot, depending on site conditions and seed mix. Contact us for a free, accurate quote for your project.