# How to prepare a new construction lot for hydroseeding

Elite Hydroseed

Before the crew sprays, agree on the finished grade, the area to seed, equipment access and who will water afterward. On a new build, these details determine what the quote covers and whether the seedbed is ready.

## Walk the lot after grading

Look for construction debris, compacted wheel paths, low spots and downspouts that discharge across bare ground. Mark these on the plan or photograph them. Ask the builder and seeding contractor who will handle each item before the application date. Seed and mulch follow the existing ground contour.

## Measure just the ground that will be planted

Split an irregular lot into rectangles. Multiply each length by its width, add the areas, then subtract the house, driveway and patios. A 40-by-60-foot backyard and a separate 10-by-40-foot side strip total 2,800 square feet. If dimensions are unavailable, the quote form also accepts an inquiry without a measurement.

## Describe slopes and equipment access

Show the route from the street, the narrowest gate and any fenced or elevated sections. Include a wide photo looking across a slope and one showing where runoff concentrates. Ask whether the proposal covers seeding alone or additional erosion control for those areas.

## Assign care after the crew leaves

Confirm that water reaches the entire area and identify who will operate it between installation and occupancy. Ask for care instructions for the selected seed and soil, and a contact for questions after a downpour. Include the handoff date in the estimate request so everyone is working to the same schedule.

[Further reading: Oklahoma State Extension on preparing a seedbed](https://extension.okstate.edu/fact-sheets/establishing-a-lawn-in-oklahoma)

[New construction seeding services](https://www.elitehydroseed.com/services/new-construction-seeding)

[Pricing](https://www.elitehydroseed.com/hydroseeding-cost) · [Request a free estimate](https://www.elitehydroseed.com/contact)
